A/C REPLACEMENT |
|
E= (Electrical Final) |
H= (Heating Final) |
|
ADDING RECEPTACLES |
|
ER (Electrical Rough), ER= (Electrical Rough and Final), ESL* (Electrical Slab*), E= (Electrical Final) |
|
|
ADDITION |
BFT (Building Footing), BFN (Building Foundation), BFD (Building Foundation Drain), BFI (Building Foundation Insulation), BFR (Building Frame), BIN (Building Insulation), BLA (Building Lath), BTR (Building Tile Roof), BEN=* (Building Energy Final*), B= (Building Final) |
ES* (Electrical Service*), ER (Electrical Rough), E= (Electrical Final) |
HI* (Heating Inside*), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) |
PB (Plumbing Base), PTO (Plumbing Top Out), PIN* (Plumbing Insulation*), P= (Plumbing Final) |
BASEMENT FINISH |
BFR (Building Frame), B= (Building Final) |
ES* (Electrical Service*), ER (Electrical Rough), ERS* (Electrical Rough and Service*), ESL* (Electrical Slab*), EP* (Electrical Panel*), E= (Electrical Final) |
HI (Heating Inside), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) |
PB (Plumbing Base), PTO (Plumbing Top Out), PIN* (Plumbing Insulation*), P= (Plumbing Final) |
BATH EXHAUST FAN (NEW) |
|
ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) |
H= (Heating Final) |
|
BOILER INSTALL (NEW) |
|
ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) |
HI (Heating Inside), HWP (Heating Process Steam and Water Pipe), H= (Heating Final) |
PTO* (Plumbing Top Out*), P=* (Plumbing Final*) |
BOILER REPLACEMENT (W/ VENT) |
|
ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E= (Electrical Final) |
HWP* (Heating Process Steam and Water Pipe*), H= (Heating Final) |
PTO* (Plumbing Top Out*), P=* (Plumbing Final*) |
DECK |
BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), B= (Building Final) |
ES* (Electrical Service*), ER* (Electrical Rough*), ER= (Electrical Rough and Final), E= (Electrical Final) |
|
|
DECK STAIR REPLACEMENT |
BFR (Building Frame), B= (Building Final) |
ES* (Electrical Service*), E=* (Electrical Final*) |
H= (Heating Final) |
|
DECK WITH COVER (NO ELECTRIC) |
BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) |
|
|
|
DECK WITH COVER (W/ ELECTRIC) |
BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) |
ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) |
|
|
DETACHED GARAGE (W/O POWER) |
BFT (Building Footing), BFN (Building Foundation), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) |
|
HRP (Heating Refrigeration Piping) |
|
DETACHED GARAGE (W/ POWER) |
BFT (Building Footing), BFN (Building Foundation), BFI (Building Foundation Insulation), BFR (Building Frame), BIN* (Building Insulation*), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final), BEN=* (Building Energy Final*) |
ES* (Electrical Service*), ER (Electrical Rough), ERS* (Electrical Rough and Service*), ES=* (Electrical Service and Final*), EUG* (Electrical Underground*), E=* (Electrical Final*) |
HRP (Heating Refrigeration Piping) |
|
ELECTRIC PANEL CHANGE-OUT |
|
ESPR* (Electrical Service Pre-release*), ES (Electrical Service), ES=* (Electrical Service and Final*), EP (Electrical Panel), E= (Electrical Final) |
|
|
ELECTRIC PANEL UPGRADE |
|
ESPR* (Electrical Service Pre-release*), ES (Electrical Service), ES=* (Electrical Service and Final*), E= (Electrical Final) |
|
|
ELECTRIC SUB PANEL (NEW) |
|
ER=* (Electrical Rough and Final*), EP (Electrical Panel), E= (Electrical Final) |
|
|
FIREPLACE FRAMING |
BFR (Building Frame), B= (Building Final) |
ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E= (Electrical Final) |
|
|
FURNACE REPLACEMENT |
|
E=* (Electrical Final*) |
H= (Heating Final) |
|
GARAGE CONVERSION |
BIN (Building Insulation), BLA (Building Lath), B= (Building Final), BEN=* (Building Energy Final*) |
ES* (Electrical Service*), ER (Electrical Rough), ERS* (Electrical Rough and Service*), E= (Electrical Final) |
HI* (Heating Inside*), HRR (Heating Residential Rough), H= (Heating Final) |
PB* (Plumbing Base*), PTO* (Plumbing Top Out*), PIN* (Plumbing Insulation*), P=* (Plumbing Final*) |
HOT TUB (NEW) |
|
ES* (Electrical Service*), ES=* (Electrical Service and Final*), E= (Electrical Final) |
|
|
INTERIOR REMODEL (NON-STRUCTURAL) |
BFR (Building Frame), B= (Building Final) |
ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), ESL* (Electrical Slab*), E=* (Electrical Final*) |
HI (Heating Inside), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) |
PB* (Plumbing Base*), PTO* (Plumbing Top Out*), PIN* (Plumbing Insulation*), P= (Plumbing Final) |
INTERIOR REMODEL (STRUCTURAL) |
BFR (Building Frame), B= (Building Final) |
ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), ESL* (Electrical Slab*), E=* (Electrical Final*) |
HI (Heating Inside), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) |
PB* (Plumbing Base*), PTO* (Plumbing Top Out*), PIN* (Plumbing Insulation*), P= (Plumbing Final) |
KITCHEN HOOD (NEW) |
|
ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) |
H= (Heating Final) |
|
METER RESET (ELECTRIC) |
|
ES (Electrical Service), ES=* (Electrical Service and Final*), EMR* (Electrical Meter Release*), E= (Electrical Final) |
|
|
METER RESET (GAS) |
|
|
HI (Heating Inside), H= (Heating Final) |
|
NEW A/C |
|
ES* (Electrical Service*), ES=* (Electrical Service and Final*), E= (Electrical Final) |
H= (Heating Final) |
|
NEW EXTERIOR GAS LINE |
|
|
HO (Heating Outside), H= (Heating Final) |
|
NEW FIREPLACE INSTALL (GAS) |
BFR (Building Frame), B= (Building Final) |
ER (Electrical Rough), ER=* (Electrical Rough and Final*), E= (Electrical Final) |
HI (Heating Inside), HO* (Heating Outside*), HV (Heating Vent), H= (Heating Final) |
|
NEW INTERIOR GAS LINE |
|
|
HI (Heating Inside), H= (Heating Final) |
|
NEW WOODBURNING STOVE |
BFR (Building Frame), B= (Building Final) |
|
|
|
PATIO COVER |
BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) |
ES* (Electrical Service*), ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E=* (Electrical Final*) |
|
|
PATIO ENCLOSURE |
BFT (Building Footing), BFR (Building Frame), BTR* (Building Tile Roof*), B= (Building Final) |
ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) |
HI* (Heating Inside*), HO* (Heating Outside*) |
|
PERGOLA |
BFT (Building Footing), BFR (Building Frame), BTR* (Building Tile Roof*), B= (Building Final) |
ES* (Electrical Service*), ER* (Electrical Rough*), ERS* (Electrical Rough and Service*), ER=* (Electrical Rough and Final*), EUG* (Electrical Underground*), E= (Electrical Final) |
|
|
PV SOLAR (NEW GROUND MOUNT UP TO 7FT) |
|
ES (Electrical Service), ER (Electrical Rough), E= (Electrical Final) |
|
|
PV SOLAR (NEW GROUND MOUNT OVER 7FT) |
BFT (Building Footing), B= (Building Final) |
ES (Electrical Service), ER (Electrical Rough), E= (Electrical Final) |
|
|
PV SOLAR (NEW ROOF MOUNT) |
BPV (Solar Attachment), B=* (Building Final*) |
ES (Electrical Service), ER (Electrical Rough), E= (Electrical Final)
BPV (Solar Attachment, Electric-Only Permit)
|
|
|
PV SOLAR (REMOVE AND REPLACE) |
BPV (Solar Attachment), B= (Building Final) |
ER* (Electrical Rough*), E= (Electrical Final), BPV (Solar Attachment, Electric-Only Permit) |
|
|
RE-ROOF (ASPHALT) |
B=R (Building Roofing Final) |
ESPR* (Electrical Service Pre-release*), ES* (Electrical Service*), E=* (Electrical Final*) |
|
|
RE-ROOF (TILE) |
BTR (Building Tile Roof), B=R (Building Roofing Final) |
ESPR* (Electrical Service Pre-release*), ES* (Electrical Service*), E=* (Electrical Final*) |
|
|
RESIDENCE |
BFT (Building Footing), BFN (Building Foundation), BFD (Building Foundation Drain), BFI (Building Foundation Insulation), BFR (Building Frame), BIN (Building Insulation), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final), BEN= (Building Energy Final) |
EUG* (Electrical Underground*), ES (Electrical Service), ER (Electrical Rough), ERS* (Electrical Rough and Service*), E= (Electrical Final) |
HI* (Heating Inside*), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) |
PB (Plumbing Base), PTO (Plumbing Top Out), PIN (Plumbing Insulation), P= (Plumbing Final) |
SERVICE UPGRADE |
BFR (Building Frame), B= (Building Final) |
ESPR* (Electrical Service Pre-release*), ES (Electrical Service), ES= (Electrical Service and Final), EUG* (Electrical Underground*), E= (Electrical Final) |
|
|
SIDING |
B= (Building Final) |
ES* (Electrical Service*), ER* (Electrical Rough*), E=* (Electrical Final*) |
|
|
SOLAR THERMAL (NEW ROOF MOUNT) |
BFR (Building Frame), B= (Building Final) |
ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E=* (Electrical Final*) |
HWP* (Heating Process Steam and Water Pipe*), H= (Heating Final) |
PIN* (Plumbing Insulation*), P= (Plumbing Final) |
SOLAR THERMAL (REPLACEMENT ROOF) |
BFR (Building Frame), B= (Building Final) |
|
H=* (Heating Final*) |
PIN* (Plumbing Insulation*), P=* (Plumbing Final*) |
STUCCO |
BLA (Building Lath), B= (Building Final) |
ES* (Electrical Service*), ER* (Electrical Rough*), E=* (Electrical Final*) |
|
|
TEMP SERVICE (ELECTRIC) |
|
EST (Electrical Service Temporary), E= (Electrical Final) |
|
|
ELECTRIC UNIT HEATER (ADDED TO EXISTING) |
|
ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) |
|
|
GAS UNIT HEATER (ADDED TO EXISTING) |
|
ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) |
HI* (Heating Inside*), H= (Heating Final) |
|
WATER HEATER REPLACEMENT |
|
E=* (Electrical Final*) |
HI* (Heating Inside*), H=* (Heating Final*) |
P= (Plumbing Final) |
WOOD STOVE INSERT |
BFR (Building Frame), B= (Building Final) |
ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E=* (Electrical Final*) |
|
|
WOODBURNING STOVE (REPLACE) |
BFR (Building Frame), B= (Building Final) |
|
|
|